Skip to main content

Assembly of the Air Traffic Control Tower in Lviv, UKRAINE

Installing 'team' in Lviv: Norbert Müller, Tim Becker, Jens Dittberner, Uwe Breitkreutz, Volker Schmidt, André KnackeCurrently installers of the Ingenieurbüro Bismark GmbH (ibb) are working on the assembly of an air traffic control tower for the airport in Lviv (Lwow) in the UKRAINE.

 

This control tower for the airport in Lviv is one of a total of 4 air traffic control towers, which were build together with the company BAN 2000 GmbH out of Berlin in the Ukraine.